Status quo: pre-demonstrator
From laboratory proof of concept towards an industrial system.
IN DEVELOPMENT · 2026
With the CDG Transfer.S2S project, the laboratory proof of concept is being turned into a pre-demonstrator: faster, multi-axis and closer to the conditions inside real equipment.
Current status
- 1.913 nm RMS position stability after linear trend removal, measured over 2 minutes (first tests, one axis)
- 128 kHz sampling in this run – measurements at up to 520 kHz technically demonstrated
- Automated alignment procedure – working
- Multi-axis control, predictive grid, in-situ position referencing (x, y, θz) – in development for the demonstrator
What comes next
Closing the loop at full speed, combining measurement and prediction, and preparing the step to industrial pilots from 2027. How a pilot works →
These are preliminary data from a single axis. A systematic validation campaign follows shortly. First results →
